Hot Tap Installation
Location: Colony Square Office Building
Equipment: Chilled Water Piping System
Description of Job: Installation of 2" hot taps was required to install a water filtration system in the building chilled water loop. The hot taps were installed while the system was in operation, thus, preventing system downtime, costly drain and refilling of water system, costly retreating system with water treatment chemicals and costly overtime.
![]() ![]() ![]() |
![]() ![]() |





